Duplex URD Cable
- Voltage Rating 600V
- Standards UL 854, ICEA S-105-692, ASTM B800
- Sheath Black Polyethylene
- Operating Tempe -40°C to +90°C
- Max Conductor Temp 90°C
Construction
Key Product Features
XLPE insulation for superior electrical and moisture resistance
Concentric neutral for balanced electrical performance
Compact duplex design for easy direct burial installation
Durable polyethylene sheath with excellent weather resistance
Phase Conductors
Neutral
Insulation
Configuration
Installation
Technical Specifications
| Code Name | Phase Conductor | Neutral | Duplex Phase Conductor(in) | Outside diameter(in) | Weight Per 1000ft (lbls) | Ampacity | |||||
| Size AWG | Strand | Insulation Thickness (mls) | Size AWG | Strand | Insulation Thickness (mls) | Direct Burial | In Duct | ||||
| Bard | 8 | 7/w | 60 | 8 | 7/w | 60 | 0.262 | 0.524 | 76 | 70 | 70 |
| Claflin | 6 | 7/w | 60 | 6 | 7/w | 60 | 0.299 | 0.596 | 91 | 95 | 70 |
| Delgado | 4 | 7/w | 60 | 4 | 7/w | 60 | 0.345 | 0.69 | 129 | 125 | 90 |
| Everett | 2 | 7/w | 60 | 2 | 7/w | 60 | 0.403 | 0.806 | 189 | 187 | 100 |
Quality Control
Raw Material Test
Raw Material Test is the critical first step in manufacturing the Duplex URD Cable. Incoming AA8000 aluminum alloy rods undergo detailed chemical composition analysis to confirm precise alloy elements and purity levels. Mechanical testing verifies tensile strength, elongation, and hardness meet ASTM B800 requirements. XLPE and polyethylene compounds are rigorously tested for thermal stability, dielectric strength, UV resistance, and moisture resistance. Surface quality inspection and dimensional measurements detect any defects or variations in rod and compound materials. Metallographic examination confirms uniform grain structure. Only raw materials that fully pass every stringent criterion are approved for wire drawing, stranding, and extrusion in the production of the Duplex URD Cable.
Process inspection
Process Inspection during the manufacturing of the Duplex URD Cable maintains precise control at every stage. After precise wire drawing of the AA8000 alloy, continuous monitoring verifies dimensional tolerances and surface quality. The stranding and assembly process uses real-time tension control to achieve uniform duplex configuration with phase conductors and concentric neutral. XLPE insulation and polyethylene sheath extrusion are carefully controlled for thickness uniformity and strong adhesion. Online diameter measurement systems and frequent visual checks prevent defects such as uneven lay or insulation imperfections. Key process parameters, including temperature and speed are strictly logged. Mid-process sampling includes partial electrical and mechanical tests. Any deviation triggers immediate corrective action. These rigorous in-process controls safeguard the structural integrity and electrical properties of the Duplex URD Cable, delivering a high-quality underground service cable.
Finished Product
Finished Product testing ensures every reel of Duplex URD Cable meets the highest quality standards. Comprehensive dimensional verification confirms overall diameter, conductor alignment, insulation thickness, and sheath uniformity. DC resistance and high-voltage tests validate electrical performance. Mechanical tests measure tensile strength and elongation of the AA8000 alloy. Full visual and tactile inspections check for surface defects or sheath imperfections. All examinations follow UL 854 and ICEA standards with detailed records for full traceability. Packaging and marking accuracy are also verified. Only the Duplex URD Cable that successfully passes 100% of these final inspections receives approval for shipment. This rigorous final quality gate assures customers of outstanding conductivity, flexibility, corrosion resistance, and reliable performance in underground residential applications.
Application
Technical Advantages
Product Packaging
Related Products
FAQ From Customers
-
What are the advantages of power cables and overhead lines?(1) Reliable operation, because it is installed in a hidden place such as underground, it is less damaged by external forces, has less chance of failure, and the power supply is safe, and it will not cause harm to people; (2) The maintenance workload is small and frequent inspections are not required; (3) No need to erect towers; (4) Help improve power factor.
-
Which aspects should be considered when choosing the cross section of a power cable?(1) The long-term allowable working current of the cable; (2) Thermal stability once short circuited; (3) The voltage drop on the line cannot exceed the allowable working range.
-
What are the measures for cable fire prevention?(1) Use flame-retardant cables; (2) Use fireproof cable tray; (3) Use fireproof paint; (4) Fire partition walls and fire baffles are installed at cable tunnels, mezzanine exits, etc.; (5) Overhead cables should avoid oil pipelines and explosion-proof doors, otherwise local pipes or heat insulation and fire prevention measures should be taken.
-
What should be paid attention to during the transportation and handling of cables?(1) During transportation, loading and unloading, cables and cable reels should not be damaged. It is strictly forbidden to push the cable reels directly from the vehicle. Generally, cables should not be transported and stored flat. (2) Before transporting or rolling the cable reel, ensure that the cable reel is firm, the cable is wound tightly, the oil pipe between the oil-filled cable and the pressure oil tank should be fixed without damage, the pressure oil tank should be firm, and the pressure indication should meet the requirements.
-
What inspections should be carried out for the acceptance of cable lines?(1) The cable specifications should meet the regulations, the arrangement should be neat, no damage, and the signs should be complete, correct and clear; (2) The fixed bending radius of the cable, the related distance and the wiring of the metal sheath of the single-core power cable should meet the requirements; (3) The cable terminal and the middle head should not leak oil, and the installation should be firm. The oil pressure of the oil-filled cable and the meter setting should meet the requirements; (4) Good grounding; (5) The color of the cable terminal is correct, and the metal parts such as the bracket are completely painted; (6) There should be no debris in the cable trench, tunnel, and bridge, and the cover should be complete.