6 Minex Aluminum Conductor Triplex Overhead Service Drop Cable
Construction
Standard
• ASTM B-231 Aluminum Conductors, Concentric-Lay-Stranded.
• ASTM B-232 Aluminum Conductors, Concentric-Lay-Stranded, Coated Steel Reinforced (ACSR).
• ASTM B-309 Concentric-Lay-Stranded 6201-T81 Aluminum Alloy Conductors.
• ASTM B-498 Zinc-Coated Steel Core Wire for Aluminum Conductors, Steel Reinforced (ACSR).
• Triplex Service Drop cable meets or exceeds all applicable requirements of ANSI/ICEA body S-76-474.
Phase Conductor
Neutral (Messenger) Conductor
Insulation
Key Features
2. Designed for single-phase 120/240V overhead service drops
3. XLP insulation for weather, UV, and abrasion resistance
4. Fully compliant with ASTM and ICEA standards
5. Optional messenger constructions available for project needs
Application
Technical Specifications
| Rated voltage | V | 600 |
| Test voltage | Veff kV/Hz | 4/50 |
| Laying temperature | °C | min. -5 |
| Operating temperature | °C | -30 ~ +90 |
| Conductor temperature | °C | max. +90 |
| Short-circuit temperature | °C/s | max. +250 /5 |
| Bending radius (min.) | mm | 20 × Ø of cable |
Quality Control
Raw Material Test
Raw material testing is the first critical quality control step for the 6 Minex Aluminum Conductor Triplex Overhead Service Drop Cable. All aluminum rods are inspected upon receipt to verify chemical composition and purity. Spectrometric analysis ensures the aluminum meets required standards for conductivity and corrosion resistance, while electrical conductivity tests confirm efficient current transmission capability. Mechanical testing is performed to evaluate tensile strength and elongation, ensuring the aluminum conductor can withstand stranding, cabling, and installation stresses. Surface inspections check for cracks, oxidation, inclusions, or contamination that could affect conductor integrity. Only aluminum materials that fully meet specifications are approved for use in the 6 Minex Aluminum Conductor Triplex Overhead Service Drop Cable.
Process inspection
Process inspection ensures consistent manufacturing quality of the 6 Minex Aluminum Conductor Triplex Overhead Service Drop Cable at every production stage. During conductor stranding, inspections focus on strand count, lay length, conductor diameter, and compactness to ensure uniform current distribution and mechanical stability. During insulation extrusion, online monitoring systems continuously measure insulation thickness and concentricity. Spark testing is applied throughout extrusion to detect pinholes or insulation defects in real time. Extrusion temperature, pressure, and line speed are carefully controlled to maintain insulation quality for the 6 Minex Aluminum Conductor Triplex Overhead Service Drop Cable.
Finished Product
Finished product testing validates the final quality of the 6 Minex Aluminum Conductor Triplex Overhead Service Drop Cable before shipment. Electrical resistance testing confirms conductor performance and compliance with standard resistance values. High-voltage withstand testing verifies insulation integrity under specified electrical stress. Mechanical testing evaluates tensile strength, elongation, and adhesion between conductor and insulation to ensure the cable can withstand installation and service loads. Dimensional inspections measure conductor size, insulation thickness, and overall cable geometry to ensure conformity with design requirements.
Application
Technical Advantages
Product Packaging
Related Products
FAQ From Customers
-
What are the advantages of power cables and overhead lines?(1) Reliable operation, because it is installed in a hidden place such as underground, it is less damaged by external forces, has less chance of failure, and the power supply is safe, and it will not cause harm to people; (2) The maintenance workload is small and frequent inspections are not required; (3) No need to erect towers; (4) Help improve power factor.
-
Which aspects should be considered when choosing the cross section of a power cable?(1) The long-term allowable working current of the cable; (2) Thermal stability once short circuited; (3) The voltage drop on the line cannot exceed the allowable working range.
-
What are the measures for cable fire prevention?(1) Use flame-retardant cables; (2) Use fireproof cable tray; (3) Use fireproof paint; (4) Fire partition walls and fire baffles are installed at cable tunnels, mezzanine exits, etc.; (5) Overhead cables should avoid oil pipelines and explosion-proof doors, otherwise local pipes or heat insulation and fire prevention measures should be taken.
-
What should be paid attention to during the transportation and handling of cables?(1) During transportation, loading and unloading, cables and cable reels should not be damaged. It is strictly forbidden to push the cable reels directly from the vehicle. Generally, cables should not be transported and stored flat. (2) Before transporting or rolling the cable reel, ensure that the cable reel is firm, the cable is wound tightly, the oil pipe between the oil-filled cable and the pressure oil tank should be fixed without damage, the pressure oil tank should be firm, and the pressure indication should meet the requirements.
-
What inspections should be carried out for the acceptance of cable lines?(1) The cable specifications should meet the regulations, the arrangement should be neat, no damage, and the signs should be complete, correct and clear; (2) The fixed bending radius of the cable, the related distance and the wiring of the metal sheath of the single-core power cable should meet the requirements; (3) The cable terminal and the middle head should not leak oil, and the installation should be firm. The oil pressure of the oil-filled cable and the meter setting should meet the requirements; (4) Good grounding; (5) The color of the cable terminal is correct, and the metal parts such as the bracket are completely painted; (6) There should be no debris in the cable trench, tunnel, and bridge, and the cover should be complete.