336 Limpet Aluminum Conductor Triplex Overhead Service Drop Cable
Construction
Standard
• ASTM B-231 Aluminum Conductors, Concentric-Lay-Stranded.
• ASTM B-232 Aluminum Conductors, Concentric-Lay-Stranded, Coated Steel Reinforced (ACSR).
• ASTM B-399 Concentric-Lay-Stranded 6201-T81 Aluminum Alloy Conductors.
• ICEA S-76-474-Neutral-supported Power Cable Assemblies With Weather-Resistant Extruded Insulation Rated 600 Volts.
Phase Conductor
Neutral (Messenger) Conductor
Insulation
Key Features
2. Optimized for 120/240V single-phase overhead service drops
3. XLP insulation provides superior UV and weather resistance
4. Complies with ASTM and ICEA standards for quality assurance
5. Suitable for long-term outdoor exposure
Application
Technical Specifications
| Rated voltage | V | 600 |
| Test voltage | Veff kV/Hz | 4/50 |
| Laying temperature | °C | min. -5 |
| Operating temperature | °C | -30 ~ +90 |
| Conductor temperature | °C | max. +90 |
| Short-circuit temperature | °C/s | max. +250 /5 |
| Bending radius (min.) | mm | 20 × Ø of cable |
Quality Control
Raw Material Test
Raw Material Test for 336.4 Limpet Aluminum Conductor Triplex Overhead Service Drop Cable ensures premium materials from the start. The structured process includes: Supplier Certification Review: Verify 1350-H19 aluminum and ACSR components meet ASTM B-230/B-231/B-232 specs for purity (>99.5% Al), stranding, and mechanical properties. Physical & Electrical Analysis: Test aluminum samples for tensile strength (>175 MPa), elongation, and conductivity (≥61% IACS); ACSR checked for zinc coating thickness, breaking load, and strand integrity. Dimensional Verification: Measure rod/wire diameters, 19-strand phase counts, 18/1 ACSR neutral configuration, and weights per unit length using precision instruments. Insulation Compound Check: XLPE pellets evaluated for density, melt index, tensile strength (>800 psi), elongation (>150%), and UV/carbon black additives for optimal weatherproofing.
Process inspection
Process Inspection during manufacturing of 336.4 Limpet Aluminum Conductor Triplex Overhead Service Drop Cable maintains precision and defect-free output. Steps include: Conductor Stranding: Monitor 19-strand compressed formation for uniform lay length, compactness, and alignment with online gauges. Insulation Extrusion: Apply black XLPE at nominal 80 mils thickness; inline scanners, diameter monitors, and spark testers ensure concentricity, uniformity, and no voids. Triplex Cabling: Helically assemble two insulated phases around the bare 336.4 MCM ACSR neutral under controlled tension for balanced structure and strong support. Continuous Real-Time Checks: Monitor conductor resistance, insulation integrity, cabling pitch, and overall diameter throughout stages.
Finished Product
Finished Product Test confirms the 336.4 Limpet Aluminum Conductor Triplex Overhead Service Drop Cable meets all performance criteria before release. The procedure includes: Visual & Dimensional Inspection: Examine full reel for surface defects, triplex uniformity, insulation consistency, markings, and measure diameter/weight per 1000 ft. Electrical Tests: Conduct DC resistance, insulation resistance (>1000 MΩ·km), and AC high-voltage withstand (per ICEA, e.g., 4–6kV) to verify dielectric strength. Mechanical Evaluation: Perform tensile strength, elongation, and breaking load tests (ACSR neutral ~8680 lbs rated) per ASTM B-230/B-232.Insulation Durability: XLPE samples tested for tensile, elongation, heat aging, thermal shock, and UV/weather resistance.Ampacity & Thermal Confirmation: Validate ratings (~395–445A at 90°C XLPE) through standard calculations and sample thermal stability.
Application
Technical Advantages
Product Packaging
Related Products
FAQ From Customers
-
What are the advantages of power cables and overhead lines?(1) Reliable operation, because it is installed in a hidden place such as underground, it is less damaged by external forces, has less chance of failure, and the power supply is safe, and it will not cause harm to people; (2) The maintenance workload is small and frequent inspections are not required; (3) No need to erect towers; (4) Help improve power factor.
-
Which aspects should be considered when choosing the cross section of a power cable?(1) The long-term allowable working current of the cable; (2) Thermal stability once short circuited; (3) The voltage drop on the line cannot exceed the allowable working range.
-
What are the measures for cable fire prevention?(1) Use flame-retardant cables; (2) Use fireproof cable tray; (3) Use fireproof paint; (4) Fire partition walls and fire baffles are installed at cable tunnels, mezzanine exits, etc.; (5) Overhead cables should avoid oil pipelines and explosion-proof doors, otherwise local pipes or heat insulation and fire prevention measures should be taken.
-
What should be paid attention to during the transportation and handling of cables?(1) During transportation, loading and unloading, cables and cable reels should not be damaged. It is strictly forbidden to push the cable reels directly from the vehicle. Generally, cables should not be transported and stored flat. (2) Before transporting or rolling the cable reel, ensure that the cable reel is firm, the cable is wound tightly, the oil pipe between the oil-filled cable and the pressure oil tank should be fixed without damage, the pressure oil tank should be firm, and the pressure indication should meet the requirements.
-
What inspections should be carried out for the acceptance of cable lines?(1) The cable specifications should meet the regulations, the arrangement should be neat, no damage, and the signs should be complete, correct and clear; (2) The fixed bending radius of the cable, the related distance and the wiring of the metal sheath of the single-core power cable should meet the requirements; (3) The cable terminal and the middle head should not leak oil, and the installation should be firm. The oil pressure of the oil-filled cable and the meter setting should meet the requirements; (4) Good grounding; (5) The color of the cable terminal is correct, and the metal parts such as the bracket are completely painted; (6) There should be no debris in the cable trench, tunnel, and bridge, and the cover should be complete.