6 Voluta Aluminum Conductor Triplex Overhead Service Drop Cable
Construction
Standard
• ASTM B-231 Aluminum Conductors, Concentric-Lay-Stranded.
• ASTM B-232 Aluminum Conductors, Concentric-Lay-Stranded, Coated Steel Reinforced (ACSR).
• ASTM B-309 Concentric-Lay-Stranded 6201-T81 Aluminum Alloy Conductors.
• ASTM B-498 Zinc-Coated Steel Core Wire for Aluminum Conductors, Steel Reinforced (ACSR).
• Triplex Service Drop cable meets or exceeds all applicable requirements of ANSI/ICEA body S-76-474.
Phase Conductor
Neutral (Messenger) Conductor
Insulation
Key Features
2. Ideal for 120/240V single-phase overhead service drops
3. XLP insulation for superior UV and weather resistance
4. Meets or exceeds ASTM and ICEA standards
5. Designed for long life and dependable outdoor performance
Application
Technical Specifications
| Rated voltage | V | 600 |
| Test voltage | Veff kV/Hz | 4/50 |
| Laying temperature | °C | min. -5 |
| Operating temperature | °C | -30 ~ +90 |
| Conductor temperature | °C | max. +90 |
| Short-circuit temperature | °C/s | max. +250 /5 |
| Bending radius (min.) | mm | 20 × Ø of cable |
Quality Control
Raw Material Test
Raw Material Test for 6 Voluta Aluminum Conductor Triplex Overhead Service Drop Cable guarantees premium component quality before production begins. The structured process includes: Supplier Certificate Review: Verify aluminum (1350-H19) and ACSR wire certifications against ASTM B-230 and B-232 for composition, purity (>99.5% Al), and mechanical properties. Chemical & Mechanical Analysis: Sample aluminum rods for tensile strength (>175 MPa), elongation, and conductivity (≥61% IACS) using lab equipment; ACSR tested for zinc coating thickness and breaking strength. Dimensional Inspection: Measure rod/wire diameters, strand counts (7 for phases, 6/1 for neutral), and unit weights with precision micrometers and scales to match specs. Insulation Compound Testing: XLPE or PE pellets evaluated for density, melt index, tensile strength, elongation, and additive levels (carbon black/UV stabilizers) to ensure long-term weather resistance.
Process inspection
Process Inspection for 6 Voluta Aluminum Conductor Triplex Overhead Service Drop Cable maintains precision and consistency during manufacturing. Key steps include: Wire Stranding: Monitor concentric or 7-strand formation of 6 AWG aluminum phases for uniform lay length, compactness, and no loose strands via online gauges. Insulation Extrusion: Apply black XLPE/PE insulation at controlled thickness (nom. 0.045–0.050 inches); inline diameter scanners and spark testers detect voids, eccentricity, or defects. Triplex Assembly: Twist two insulated phases around the bare 6 AWG ACSR neutral under precise tension to achieve balanced triplex configuration and optimal messenger support. Real-Time Monitoring: Continuous checks on conductor resistance, insulation integrity, twisting pitch, and overall diameter at multiple production stages.
Finished Product
Finished Product Test verifies the 6 Voluta Aluminum Conductor Triplex Overhead Service Drop Cable meets all specifications before release. The comprehensive procedure includes: Visual & Dimensional Examination: Inspect full reel for surface defects, correct triplex lay, insulation uniformity, markings (size, voltage, standards), and measure overall diameter/weight per 1000 ft. Electrical Testing: Conductor DC resistance, insulation resistance (>1000 MΩ·km), and high-voltage withstand (AC 6kV/5 min) per ICEA standards to confirm dielectric strength. Mechanical Evaluation: Tensile strength, elongation, and breaking load tests on aluminum phases and ACSR neutral per ASTM B-230/B-232; flexibility and crush resistance assessed. Insulation Performance: XLPE/PE samples tested for tensile (>800 psi), elongation (>150%), heat aging, thermal shock, and UV/weather resistance.
Application
Technical Advantages
Product Packaging
Related Products
FAQ From Customers
-
What are the advantages of power cables and overhead lines?(1) Reliable operation, because it is installed in a hidden place such as underground, it is less damaged by external forces, has less chance of failure, and the power supply is safe, and it will not cause harm to people; (2) The maintenance workload is small and frequent inspections are not required; (3) No need to erect towers; (4) Help improve power factor.
-
Which aspects should be considered when choosing the cross section of a power cable?(1) The long-term allowable working current of the cable; (2) Thermal stability once short circuited; (3) The voltage drop on the line cannot exceed the allowable working range.
-
What are the measures for cable fire prevention?(1) Use flame-retardant cables; (2) Use fireproof cable tray; (3) Use fireproof paint; (4) Fire partition walls and fire baffles are installed at cable tunnels, mezzanine exits, etc.; (5) Overhead cables should avoid oil pipelines and explosion-proof doors, otherwise local pipes or heat insulation and fire prevention measures should be taken.
-
What should be paid attention to during the transportation and handling of cables?(1) During transportation, loading and unloading, cables and cable reels should not be damaged. It is strictly forbidden to push the cable reels directly from the vehicle. Generally, cables should not be transported and stored flat. (2) Before transporting or rolling the cable reel, ensure that the cable reel is firm, the cable is wound tightly, the oil pipe between the oil-filled cable and the pressure oil tank should be fixed without damage, the pressure oil tank should be firm, and the pressure indication should meet the requirements.
-
What inspections should be carried out for the acceptance of cable lines?(1) The cable specifications should meet the regulations, the arrangement should be neat, no damage, and the signs should be complete, correct and clear; (2) The fixed bending radius of the cable, the related distance and the wiring of the metal sheath of the single-core power cable should meet the requirements; (3) The cable terminal and the middle head should not leak oil, and the installation should be firm. The oil pressure of the oil-filled cable and the meter setting should meet the requirements; (4) Good grounding; (5) The color of the cable terminal is correct, and the metal parts such as the bracket are completely painted; (6) There should be no debris in the cable trench, tunnel, and bridge, and the cover should be complete.