The 2XS(FL)2Y HDPE High Voltage 64/110 (123) kV Power Cable is a single-core copper conductor high-voltage cable designed for long-distance and high-load power transmission. It features XLPE insulation for superior dielectric strength, semi-conductive conductor and insulation screens for optimal electrical performance, and semi-conductive water-swellable tapes for longitudinal water blocking. A longitudinal aluminium tape moisture barrier with PE copolymer coating provides excellent water and moisture resistance, while the HDPE outer sheath ensures exceptional mechanical and chemical protection. Complying with IEC 60840, this cable is suitable for direct burial, underwater, outdoor, indoor, and duct installations, making it ideal for distribution networks, power stations, and industrial plants.
Voltage Rating (Uo/U)(Um): 64/110kV (123kV)
Construction
Technical Specifications
Quality Control
Application

Construction

2XS(FL)2Y HDPE High Voltage 64/110 (123) kV Power Cable Constrution
2XS(FL)2Y HDPE High Voltage 64/110 (123) kV Power Cable

Conductor

Copper conductor (optional watertightness – WTC)

Insulation

XLPE (Cross-Linked Polyethylene)

Conductor Screen

Semi-conductive screen extruded on the phase conductor

Insulation Screen

Semi-conductive screen extruded on insulation

Wrapping

Semi-conductive water swelling tape

Metallic Screen

Copper wires and equalising tape

Sheath

HDPE (High Density Polyethylene)Optional —semi-conductive layer

Sheath Colour

Black

Manufacturer Standard

IEC 60840

Tape

Longitudinally applied aluminium tape coated with PE copolymer

Application

2XS(FL)2Y HDPE High Voltage 64/110 (123) kV Power Cable is used in distribution networks, for connection to generation units, and for plant and process connections, suitable for installation in ground, in water, outdoors, indoors, and in cable ducts for power stations and industrial facilities. The water-blocking tape prevents water propagation inside the cable, ensuring reliable long-term performance.

Technical Specifications

2XS(FL)2Y HDPE High Voltage 64/110 (123) kV Power Cable
2XS(FL)2Y HDPE High Voltage 64/110 (123) kV Power Cable

No. Of

Cores

NOMINAL CROSS

SECTIONAL AREA

mm²

INSULATION
mm
METALLIC SCREEN

NOMINAL

WEIGHT

kg/km

MAXIMUM PULLING

FORCE

kN

Nominal Thickness

Nominal Diameter

over

Nominal cross

Section

mm²

Nominal Diameter

Over

mm

1 150RM 18.0 53.4 95 59.2 5280 7.5
1 185RM 17.0 52.2 95 58.0 5450 9.3
1 240RM 16.5 53.5 95 59.3 6000 12.0
1 300RM 15.5 53.5 95 59.3 6500 15.0
1 400RM 14.5 54.6 95 60.4 7300 20.0
1 500RM 14.0 56.4 95 62.2 8350 25.0
1 630RM 14.0 60.9 95 66.7 9920 31.5
1 800RM 14.0 65.3 95 71.1 11740 40.0
1 1000RM 14.0 68.9 95 74.7 13880 50.0
1 1200RMS 14.0 73.8 95 79.6 16090 60.0
1 1400RMS 14.0 78.0 95 83.8 18040 70.0
1 1600RMS 14.0 81.8 95 87.6 20290 80.0
1 1800RMS 14.0 85.4 95 91.2 22700 90.0
1 2000RMS 14.0 86.8 95 92.6 24270 100.0
1 2500RMS 14.5 94.2 95 100.4 29380 100.0
1 3000RMS 14.5 102.6 95 108.8 35960 100.0

Quality Control

2XS(FL)2Y HDPE High Voltage 64/110 (123) kV Power Cable
Raw Material Test

Raw Material Test

NPC has always chosen raw material suppliers who have a good reputation, possess stable supply capabilities and have passed international quality system certifications (such as ISO 9001). And establish a long-term cooperative relationship with it, forming a stable and reliable raw material supply chain.
We will ensure that all raw materials are subject to strict inspection procedures upon entry to the factory, and can only be stored in the warehouse after they have been confirmed to meet the standards.

Process inspection

Process inspection

NPC has strict quality control procedures for each process in the cable production process.
Process documents: Develop detailed process flow and operation instructions to clarify the operating specifications and quality standards of each process.
Equipment calibration: Regularly calibrate key equipment such as wire drawing machines, stranding machines, extruders, and diameter gauges to ensure that the accuracy meets the requirements.
First piece confirmation: Before each batch of production, the first piece is trial-produced to confirm that the process parameters, product dimensions, electrical performance, etc. meet the standards before mass production can be carried out.

Finished Product

Finished Product

Inspectors conduct ex-factory inspections on cables according to relevant standards and corresponding product inspection specifications to ensure that each ex-factory product complies with the process regulations.

Application

2XS(FL)2Y HDPE High Voltage 64/110 (123) kV Power Cable is used in distribution networks, for connection to generation units, and for plant and process connections, suitable for installation in ground, in water, outdoors, indoors, and in cable ducts for power stations and industrial facilities.

Technical Advantages

● 30+ years of manufacturing experience
● ISO and UL certified production
● Customized cable and transformer solutions

Product Packaging

Wires and Cables packaging (1)
Wires and Cables packaging (1)
Wires and Cables packaging (2)
Wires and Cables packaging (2)
Wires and Cables packaging (3)
Wires and Cables packaging (3)
Wires and Cables packaging (4)
Wires and Cables packaging (4)
Wires and Cables packaging (5)
Wires and Cables packaging (5)
Wires and Cables packaging (6)
Wires and Cables packaging (6)
Wires and Cables packaging (7)
Wires and Cables packaging (7)
Wires and Cables packaging (8)
Wires and Cables packaging (8)

Related Products

FAQ From Customers

What are the advantages of power cables and overhead lines?
(1) Reliable operation, because it is installed in a hidden place such as underground, it is less damaged by external forces, has less chance of failure, and the power supply is safe, and it will not cause harm to people;
(2) The maintenance workload is small and frequent inspections are not required;
(3) No need to erect towers;
(4) Help improve power factor.
Which aspects should be considered when choosing the cross section of a power cable?
(1) The long-term allowable working current of the cable;
(2) Thermal stability once short circuited;
(3) The voltage drop on the line cannot exceed the allowable working range.
What are the measures for cable fire prevention?
(1) Use flame-retardant cables;
(2) Use fireproof cable tray;
(3) Use fireproof paint;
(4) Fire partition walls and fire baffles are installed at cable tunnels, mezzanine exits, etc.;
(5) Overhead cables should avoid oil pipelines and explosion-proof doors, otherwise local pipes or heat insulation and fire prevention measures should be taken.
What should be paid attention to during the transportation and handling of cables?
(1) During transportation, loading and unloading, cables and cable reels should not be damaged. It is strictly forbidden to push the cable reels directly from the vehicle. Generally, cables should not be transported and stored flat.
(2) Before transporting or rolling the cable reel, ensure that the cable reel is firm, the cable is wound tightly, the oil pipe between the oil-filled cable and the pressure oil tank should be fixed without damage, the pressure oil tank should be firm, and the pressure indication should meet the requirements.
What inspections should be carried out for the acceptance of cable lines?
(1) The cable specifications should meet the regulations, the arrangement should be neat, no damage, and the signs should be complete, correct and clear;
(2) The fixed bending radius of the cable, the related distance and the wiring of the metal sheath of the single-core power cable should meet the requirements;
(3) The cable terminal and the middle head should not leak oil, and the installation should be firm. The oil pressure of the oil-filled cable and the meter setting should meet the requirements;
(4) Good grounding;
(5) The color of the cable terminal is correct, and the metal parts such as the bracket are completely painted;
(6) There should be no debris in the cable trench, tunnel, and bridge, and the cover should be complete.