4 Scallop Aluminum Conductor Triplex Overhead Service Drop Cable
Construction
Standard
• ASTM B-231 Aluminum Conductors, Concentric-Lay-Stranded.
• ASTM B-232 Aluminum Conductors, Concentric-Lay-Stranded, Coated Steel Reinforced (ACSR).
• ASTM B-399 Concentric-Lay-Stranded 6201-T81 Aluminum Alloy Conductors.
• ICEA S-76-474-Neutral-supported Power Cable Assemblies With Weather-Resistant Extruded Insulation Rated 600 Volts.
Phase Conductor
Neutral (Messenger) Conductor
Insulation
Key Features
2. Suitable for 120/240V single-phase service drops
3. XLP insulation for UV, moisture, and abrasion resistance
4. Complies with ASTM and ICEA standards for reliability
5. Designed for overhead installation without conduit
Application
Technical Specifications
| Rated voltage | V | 600 |
| Test voltage | Veff kV/Hz | 4/50 |
| Laying temperature | °C | min. -5 |
| Operating temperature | °C | -30 ~ +90 |
| Conductor temperature | °C | max. +90 |
| Short-circuit temperature | °C/s | max. +250 /5 |
| Bending radius (min.) | mm | 20 × Ø of cable |
Quality Control
Raw Material Test
Raw Material Test for 4 Scallop Aluminum Conductor Triplex Overhead Service Drop Cable ensures only premium inputs enter production. The rigorous testing process includes: 1. Incoming Inspection: All aluminum rods (1350-H19 grade) and ACSR messenger wires are verified against supplier certificates for chemical composition (purity >99.5% aluminum), tensile strength, and elongation per ASTM B-230. Visual checks detect surface defects like cracks or oxidation. 2. Dimensional Verification: Measure rod diameter and weight per unit length using calibrated micrometers and scales to confirm compliance with specifications. 3. Electrical Conductivity Test: Sample rods undergo conductivity testing (minimum 61.2% IACS) via resistance bridge to validate current-carrying capability.
Process inspection
Process Inspection during the manufacturing of 4 Scallop Aluminum Conductor Triplex Overhead Service Drop Cable maintains consistency and defect-free production. The step-by-step procedure includes: 1. Wire Drawing & Stranding: Monitor aluminum wire drawing for uniform diameter and surface finish. During concentric stranding, check lay length, strand alignment, and compactness using online gauges. 2. Insulation Extrusion: Extrude black XLPE over phase conductors with precise thickness (0.045 inches nominal). Inline monitors verify insulation concentricity, thickness uniformity, and absence of voids via spark testers and diameter scanners.3. Messenger Assembly: Twist the bare ACSR neutral messenger with insulated phases under controlled tension to form the triplex configuration. Inspect twisting pitch and bonding strength.
Finished Product
Finished Product Test confirms the 4 Scallop Aluminum Conductor Triplex Overhead Service Drop Cable meets all performance criteria before shipment. The comprehensive testing process includes:1. Visual & Dimensional Inspection: Examine entire cable length for surface defects, insulation uniformity, triplex lay consistency, and correct marking (e.g., size, voltage, standards). Measure overall diameter and weights per 1000ft. 2. Electrical Tests: Perform conductor resistance, insulation resistance (>1000 MΩ·km), and high-voltage withstand (AC 6kV for 5 minutes) per ICEA S-76-474 to verify dielectric strength. 3. Mechanical Tests: Tensile strength and elongation of conductors/messenger tested per ASTM B-230/B-232. Bending and crush resistance evaluated for handling durability.4. Insulation Property Tests: Check XLPE for tensile strength (>800 psi), elongation (>150%), heat aging, and UV resistance to ensure long-term weatherproofing.
Application
Technical Advantages
Product Packaging
Related Products
FAQ From Customers
-
What are the advantages of power cables and overhead lines?(1) Reliable operation, because it is installed in a hidden place such as underground, it is less damaged by external forces, has less chance of failure, and the power supply is safe, and it will not cause harm to people; (2) The maintenance workload is small and frequent inspections are not required; (3) No need to erect towers; (4) Help improve power factor.
-
Which aspects should be considered when choosing the cross section of a power cable?(1) The long-term allowable working current of the cable; (2) Thermal stability once short circuited; (3) The voltage drop on the line cannot exceed the allowable working range.
-
What are the measures for cable fire prevention?(1) Use flame-retardant cables; (2) Use fireproof cable tray; (3) Use fireproof paint; (4) Fire partition walls and fire baffles are installed at cable tunnels, mezzanine exits, etc.; (5) Overhead cables should avoid oil pipelines and explosion-proof doors, otherwise local pipes or heat insulation and fire prevention measures should be taken.
-
What should be paid attention to during the transportation and handling of cables?(1) During transportation, loading and unloading, cables and cable reels should not be damaged. It is strictly forbidden to push the cable reels directly from the vehicle. Generally, cables should not be transported and stored flat. (2) Before transporting or rolling the cable reel, ensure that the cable reel is firm, the cable is wound tightly, the oil pipe between the oil-filled cable and the pressure oil tank should be fixed without damage, the pressure oil tank should be firm, and the pressure indication should meet the requirements.
-
What inspections should be carried out for the acceptance of cable lines?(1) The cable specifications should meet the regulations, the arrangement should be neat, no damage, and the signs should be complete, correct and clear; (2) The fixed bending radius of the cable, the related distance and the wiring of the metal sheath of the single-core power cable should meet the requirements; (3) The cable terminal and the middle head should not leak oil, and the installation should be firm. The oil pressure of the oil-filled cable and the meter setting should meet the requirements; (4) Good grounding; (5) The color of the cable terminal is correct, and the metal parts such as the bracket are completely painted; (6) There should be no debris in the cable trench, tunnel, and bridge, and the cover should be complete.