2/0 Runcina Aluminum Conductor Triplex Overhead Service Drop Cable
Construction
Standard
• ASTM B-231 Aluminum Conductors, Concentric-Lay-Stranded.
• ASTM B-232 Aluminum Conductors, Concentric-Lay-Stranded, Coated Steel Reinforced (ACSR).
• ASTM B-399 Concentric-Lay-Stranded 6201-T81 Aluminum Alloy Conductors.
• ICEA S-76-474-Neutral-supported Power Cable Assemblies With Weather-Resistant Extruded Insulation Rated 600 Volts.
Phase Conductor
Neutral (Messenger) Conductor
Insulation
Key Features
2. Temperature rating: 75°C (PE), 90°C (XLP)
3. Conductors: 1350-H19 Aluminum, stranded or compressed
4. Bare AAAC messenger for neutral and support
5. Insulation: Black cross-linked polyethylene (XLP), UV and weather resistant
6. Flexible design for easy stringing and tensioning
Application
Technical Specifications
| Rated voltage | V | 600 |
| Test voltage | Veff kV/Hz | 4/50 |
| Laying temperature | °C | min. -5 |
| Operating temperature | °C | -30 ~ +90 |
| Conductor temperature | °C | max. +90 |
| Short-circuit temperature | °C/s | max. +250 /5 |
| Bending radius (min.) | mm | 20 × Ø of cable |
Quality Control
Raw Material Test
The Raw Material Test for the 2/0 Runcina Aluminum Conductor Triplex Overhead Service Drop Cable begins with supplier qualification and batch traceability. Step one evaluates aluminum rods for chemical composition, electrical conductivity, tensile strength, and elongation. Step two tests insulation compounds for thermal stability, tensile performance, and aging resistance. Step three includes moisture analysis and contamination inspection to ensure material cleanliness. All approved materials are documented and traceable throughout manufacturing. This disciplined Raw Material Test process ensures that the 2/0 Runcina Aluminum Conductor Triplex Overhead Service Drop Cable is produced using only qualified inputs.
Process inspection
Process Inspection for the 2/0 Runcina Aluminum Conductor Triplex Overhead Service Drop Cable focuses on precise control throughout manufacturing. Step one checks wire drawing tolerances and surface condition. Step two inspects conductor stranding geometry and flexibility. Step three controls insulation extrusion parameters such as temperature, thickness, and concentricity, supported by continuous spark testing. Step four verifies cabling tension, lay length, and conductor alignment. Regular sampling ensures electrical resistance and mechanical properties remain within specification.
Finished Product
Finished Product Testing of the 2/0 Runcina Aluminum Conductor Triplex Overhead Service Drop Cable includes comprehensive final evaluations. Step one conducts DC resistance and continuity testing. Step two applies tensile load testing to confirm mechanical integrity. Step three performs insulation voltage withstand testing. Step four carries out environmental aging simulations. Final visual inspection and dimensional verification ensure shipment-ready quality.
Application
Technical Advantages
Product Packaging
Related Products
FAQ From Customers
-
What are the advantages of power cables and overhead lines?(1) Reliable operation, because it is installed in a hidden place such as underground, it is less damaged by external forces, has less chance of failure, and the power supply is safe, and it will not cause harm to people; (2) The maintenance workload is small and frequent inspections are not required; (3) No need to erect towers; (4) Help improve power factor.
-
Which aspects should be considered when choosing the cross section of a power cable?(1) The long-term allowable working current of the cable; (2) Thermal stability once short circuited; (3) The voltage drop on the line cannot exceed the allowable working range.
-
What are the measures for cable fire prevention?(1) Use flame-retardant cables; (2) Use fireproof cable tray; (3) Use fireproof paint; (4) Fire partition walls and fire baffles are installed at cable tunnels, mezzanine exits, etc.; (5) Overhead cables should avoid oil pipelines and explosion-proof doors, otherwise local pipes or heat insulation and fire prevention measures should be taken.
-
What should be paid attention to during the transportation and handling of cables?(1) During transportation, loading and unloading, cables and cable reels should not be damaged. It is strictly forbidden to push the cable reels directly from the vehicle. Generally, cables should not be transported and stored flat. (2) Before transporting or rolling the cable reel, ensure that the cable reel is firm, the cable is wound tightly, the oil pipe between the oil-filled cable and the pressure oil tank should be fixed without damage, the pressure oil tank should be firm, and the pressure indication should meet the requirements.
-
What inspections should be carried out for the acceptance of cable lines?(1) The cable specifications should meet the regulations, the arrangement should be neat, no damage, and the signs should be complete, correct and clear; (2) The fixed bending radius of the cable, the related distance and the wiring of the metal sheath of the single-core power cable should meet the requirements; (3) The cable terminal and the middle head should not leak oil, and the installation should be firm. The oil pressure of the oil-filled cable and the meter setting should meet the requirements; (4) Good grounding; (5) The color of the cable terminal is correct, and the metal parts such as the bracket are completely painted; (6) There should be no debris in the cable trench, tunnel, and bridge, and the cover should be complete.