x
1033.5 MCM CURLEW ACSR Conductor Cable
1033.5 MCM CURLEW ACSR Conductor Cable

1033.5 MCM CURLEW ACSR Conductor Cable

The ACSR 1033.5 MCM Curlew 54/7 is a high-performance, bare concentric-lay-stranded conductor designed for overhead power transmission and distribution lines. Complying with ASTM B232 standards, this conductor features a robust galvanized steel core (Class A or B) for enhanced mechanical strength, surrounded by multiple layers of hard-drawn 1350-H19 aluminum wire for superior electrical conductivity. The Curlew configuration, with 54 aluminum strands and 7 steel strands, ensures an optimal balance of durability and efficiency, making it ideal for long-span transmission lines and primary/secondary distribution networks. Engineered for reliability, ACSR Curlew offers excellent corrosion resistance and customizable aluminum-to-steel ratios to meet specific electrical and mechanical requirements.
Construction
Technical Specifications
Quality Control
Application

Construction

1033.5 MCM CURLEW ACSR Conductor Cable Construction
1033.5 MCM CURLEW ACSR Conductor Cable Construction

Standard

Product ASTM B232
The rapid development of aluminum as an electrical conductor material stems primarily from its excellent electrical characteristics. Nevertheless, because most transmission lines span long distances, aluminum conductors necessitate supplementary mechanical reinforcement, typically achieved by using galvanized steel wires for the ACSR core.

Construction

Functioning as a concentrically stranded conductor, ACSR comprises a galvanized steel core—either single-wire or stranded (size-dependent)—surrounded by one or more layers of hard-drawn 1350-H19 aluminum wire. Its steel component includes Class A or B galvanization for anti-corrosion performance. By adjusting the quantities of aluminum and steel wires, ACSR can be engineered to fulfill specific electrical and mechanical demands of overhead transmission and distribution lines.

Applications

This bare cable finds extensive application in overhead transmission lines, while also functioning as primary and secondary cable for distribution networks.

Conditions for Ampacity Calculation

Conductor temperature = 75 °C;
Room temperature = 25 °C

Technical Specifications

1033.5 MCM CURLEW ACSR Conductor Cable
1033.5 MCM CURLEW ACSR Conductor Cable
Construction characteristics
Type of cable Curlew
Type of conductor Circular, stranded
Conductor material aluminum / Steel Core
Conductor flexibility Class AA
Conductor shape Circular non compacted
Dimensional characteristics
Conductor cross-section 1033.5 kcmil
Aluminium cross-section 522.57 mm²
Conductor cross-section 590.25 mm²
Number of aluminium wires 54
Diameter of aluminium wires 3.51 mm
Number of steel wires 7
Diameter of steel wires 3.51 mm
Diameter of steel core 10.53 mm
Conductor diameter 31.59 mm
Average geometric radius 0.0128 m
Aluminium content 1450 kg/km
Steel content 529 kg/km
Approximate weight 1979 kg/km
Nominal outer diameter 31.59 mm
Number of cores 1
Number of round wires 61
Electrical characteristics
Max. DC resistance of the conductor at 20°C 0.0554 Ohm/km
Max. electric resistance AC 60Hz 75°C 0.067 Ohm/km
Inductive reactance 0.3287 Ohm/km
Capacitive reactance 0.198 MOhm.km
Ampacity 1040.0 A
Mechanical characteristics
Rated breaking load (Class A) 16560 kgf
Rated breaking load (Class B) 16101 kgf
Hardness type 1350-H19
Usage characteristics
Length 1920 m
Reel net weight 3800 kg
Packaging Reel 210/100

Quality Control

1033.5 MCM CURLEW ACSR Conductor Cable
1033.5 MCM CURLEW ACSR Conductor Cable  Raw Material Test

Raw Material Test

NPC has always chosen raw material suppliers who have a good reputation, possess stable supply capabilities and have passed international quality system certifications (such as ISO 9001). And establish a long-term cooperative relationship with it, forming a stable and reliable raw material supply chain.
We will ensure that all raw materials are subject to strict inspection procedures upon entry to the factory, and can only be stored in the warehouse after they have been confirmed to meet the standards.

1033.5 MCM CURLEW ACSR Conductor Cable Process inspection

Process inspection

NPC has strict quality control procedures for each process in the cable production process.
Process documents: Develop detailed process flow and operation instructions to clarify the operating specifications and quality standards of each process.
Equipment calibration: Regularly calibrate key equipment such as wire drawing machines, stranding machines, extruders, and diameter gauges to ensure that the accuracy meets the requirements.
First piece confirmation: Before each batch of production, the first piece is trial-produced to confirm that the process parameters, product dimensions, electrical performance, etc. meet the standards before mass production can be carried out.

1033.5 MCM CURLEW ACSR Conductor Cable Finished Product

Finished Product

Inspectors conduct ex-factory inspections on cables according to relevant standards and corresponding product inspection specifications to ensure that each ex-factory product complies with the process regulations.

Application

This bare cable finds extensive application in overhead transmission lines, while also functioning as primary and secondary cable for distribution networks.

Technical Advantages

● 30+ years of manufacturing experience
● ISO and UL certified production
● Customized cable and transformer solutions

Product Packaging

Wires and Cables packaging (1)
Wires and Cables packaging (1)
Wires and Cables packaging (2)
Wires and Cables packaging (2)
Wires and Cables packaging (3)
Wires and Cables packaging (3)
Wires and Cables packaging (4)
Wires and Cables packaging (4)
Wires and Cables packaging (5)
Wires and Cables packaging (5)
Wires and Cables packaging (6)
Wires and Cables packaging (6)
Wires and Cables packaging (7)
Wires and Cables packaging (7)
Wires and Cables packaging (8)
Wires and Cables packaging (8)

Related Products

FAQ From Customers

What are the advantages of power cables and overhead lines?
(1) Reliable operation, because it is installed in a hidden place such as underground, it is less damaged by external forces, has less chance of failure, and the power supply is safe, and it will not cause harm to people;
(2) The maintenance workload is small and frequent inspections are not required;
(3) No need to erect towers;
(4) Help improve power factor.
Which aspects should be considered when choosing the cross section of a power cable?
(1) The long-term allowable working current of the cable;
(2) Thermal stability once short circuited;
(3) The voltage drop on the line cannot exceed the allowable working range.
What are the measures for cable fire prevention?
(1) Use flame-retardant cables;
(2) Use fireproof cable tray;
(3) Use fireproof paint;
(4) Fire partition walls and fire baffles are installed at cable tunnels, mezzanine exits, etc.;
(5) Overhead cables should avoid oil pipelines and explosion-proof doors, otherwise local pipes or heat insulation and fire prevention measures should be taken.
What should be paid attention to during the transportation and handling of cables?
(1) During transportation, loading and unloading, cables and cable reels should not be damaged. It is strictly forbidden to push the cable reels directly from the vehicle. Generally, cables should not be transported and stored flat.
(2) Before transporting or rolling the cable reel, ensure that the cable reel is firm, the cable is wound tightly, the oil pipe between the oil-filled cable and the pressure oil tank should be fixed without damage, the pressure oil tank should be firm, and the pressure indication should meet the requirements.
What inspections should be carried out for the acceptance of cable lines?
(1) The cable specifications should meet the regulations, the arrangement should be neat, no damage, and the signs should be complete, correct and clear;
(2) The fixed bending radius of the cable, the related distance and the wiring of the metal sheath of the single-core power cable should meet the requirements;
(3) The cable terminal and the middle head should not leak oil, and the installation should be firm. The oil pressure of the oil-filled cable and the meter setting should meet the requirements;
(4) Good grounding;
(5) The color of the cable terminal is correct, and the metal parts such as the bracket are completely painted;
(6) There should be no debris in the cable trench, tunnel, and bridge, and the cover should be complete.

Welcome your inquiry

Honesty, Integrity, Frugality, Activeness and Passion