4 Barnacles Aluminum Conductor Triplex Overhead Service Drop Cable
Construction
Standard
• ASTM B-231 Aluminum Conductors, Concentric-Lay-Stranded.
• ASTM B-232 Aluminum Conductors, Concentric-Lay-Stranded, Coated Steel Reinforced (ACSR).
• ASTM B-399 Concentric-Lay-Stranded 6201-T81 Aluminum Alloy Conductors.
• ICEA S-76-474-Neutral-supported Power Cable Assemblies With Weather-Resistant Extruded Insulation Rated 600 Volts.
Phase Conductor
Neutral (Messenger) Conductor
Insulation
Key Features
2. Rated for 600V overhead power distribution
3. UV, moisture, and abrasion resistant XLP insulation
4. Lightweight design for easier handling and stringing
5. AAAC messenger provides neutral support and mechanical strength
6. Compliant with ASTM and ICEA standards
Application
Technical Specifications
| Rated voltage | V | 600 |
| Test voltage | Veff kV/Hz | 4/50 |
| Laying temperature | °C | min. -5 |
| Operating temperature | °C | -30 ~ +90 |
| Conductor temperature | °C | max. +90 |
| Short-circuit temperature | °C/s | max. +250 /5 |
| Bending radius (min.) | mm | 20 × Ø of cable |
Quality Control
Raw Material Test
Raw Material Testing for the 4 Barnacles Aluminum Conductor Triplex Overhead Service Drop Cable begins with a systematic inspection of all incoming materials. Step one verifies aluminum rod chemical composition through spectrometric analysis to ensure compliance with conductivity and purity requirements. Step two performs tensile strength and elongation testing on aluminum rods to confirm mechanical durability and flexibility. Insulation raw materials are evaluated for density, melt flow index, tensile strength, thermal stability, and resistance to environmental aging. Step three includes moisture content measurement and detailed visual inspection to eliminate contamination and surface defects. Only materials meeting all electrical, mechanical, and physical specifications are released for production.
Process inspection
Process Inspection of the 4 Barnacles Aluminum Conductor Triplex Overhead Service Drop Cable is conducted at every critical stage of manufacturing. Step one monitors aluminum wire drawing to maintain precise conductor diameter and consistent surface quality. Step two inspects stranding geometry, lay length, and strand alignment to ensure uniformity and flexibility. During insulation extrusion, step three controls insulation thickness, concentricity, and adhesion using continuous online measurement systems. Spark testing is applied to identify insulation defects in real time. Step four verifies correct cabling of the insulated phase conductors around the neutral messenger, ensuring proper tension balance and structural stability. Routine sampling confirms electrical resistance and mechanical properties. This comprehensive Process Inspection ensures consistent production quality and reliable cable performance.
Finished Product
Finished Product Testing of the 4 Barnacles Aluminum Conductor Triplex Overhead Service Drop Cable validates final compliance with technical and safety requirements. Step one measures DC conductor resistance to confirm electrical efficiency. Step two performs tensile load and elongation testing on the completed cable assembly. Step three conducts insulation voltage withstand and continuity testing. Step four simulates environmental conditions such as heat cycling and UV exposure to assess long-term durability. Final dimensional verification and visual inspection are completed prior to packaging. Only fully qualified products are approved for shipment.
Application
Technical Advantages
Product Packaging
Related Products
FAQ From Customers
-
What are the advantages of power cables and overhead lines?(1) Reliable operation, because it is installed in a hidden place such as underground, it is less damaged by external forces, has less chance of failure, and the power supply is safe, and it will not cause harm to people; (2) The maintenance workload is small and frequent inspections are not required; (3) No need to erect towers; (4) Help improve power factor.
-
Which aspects should be considered when choosing the cross section of a power cable?(1) The long-term allowable working current of the cable; (2) Thermal stability once short circuited; (3) The voltage drop on the line cannot exceed the allowable working range.
-
What are the measures for cable fire prevention?(1) Use flame-retardant cables; (2) Use fireproof cable tray; (3) Use fireproof paint; (4) Fire partition walls and fire baffles are installed at cable tunnels, mezzanine exits, etc.; (5) Overhead cables should avoid oil pipelines and explosion-proof doors, otherwise local pipes or heat insulation and fire prevention measures should be taken.
-
What should be paid attention to during the transportation and handling of cables?(1) During transportation, loading and unloading, cables and cable reels should not be damaged. It is strictly forbidden to push the cable reels directly from the vehicle. Generally, cables should not be transported and stored flat. (2) Before transporting or rolling the cable reel, ensure that the cable reel is firm, the cable is wound tightly, the oil pipe between the oil-filled cable and the pressure oil tank should be fixed without damage, the pressure oil tank should be firm, and the pressure indication should meet the requirements.
-
What inspections should be carried out for the acceptance of cable lines?(1) The cable specifications should meet the regulations, the arrangement should be neat, no damage, and the signs should be complete, correct and clear; (2) The fixed bending radius of the cable, the related distance and the wiring of the metal sheath of the single-core power cable should meet the requirements; (3) The cable terminal and the middle head should not leak oil, and the installation should be firm. The oil pressure of the oil-filled cable and the meter setting should meet the requirements; (4) Good grounding; (5) The color of the cable terminal is correct, and the metal parts such as the bracket are completely painted; (6) There should be no debris in the cable trench, tunnel, and bridge, and the cover should be complete.